Water lines (pressure test for site installed portion) Soil bearing penetrometer test reading posted in a conspicuous place on the jobsite Under carriage Inspection (Includes the following items to be completed and visible at inspection).Footing Inspection (prior to pouring concrete footings).Marriage Wall Inspection (For multi wide’s only) Connection of floor, roof, and end walls.The following are the minimum inspections required for a Manufactured Mobile Home, other inspections may be required depending on the complexity of your project: Throughout your building permit process and depending upon the extent of the work, you will be required to complete different inspections. In addition to the Manufactured Mobile Home Permit submission requirements, when installing a Manufactured Mobile Home, you need to submit the following information: Submitted construction documents must contain sufficient information for plan reviewers to be able to review the proposed construction work. Manufactured Mobile Home Permit for the installation of a Manufactured Mobile HomeĬustomers can choose to submit building permits and land disturbance applications in paper or electronic form. #Mobile home wind rating code#All electrical, plumbing, mechanical, and gas fuel work shall meet the requirements of the current edition of each prescriptive code including the current edition of the North Carolina Regulations for Manufactured Homes. Footings, pier spacing, and anchorage shall meet the current North Carolina Regulations for Manufactured Homes and the Manufacturers Installation Instructions. Any deck exceeding 36 square feet will require a separate building permit meeting the current edition of the North Carolina Residential Code. Exterior wood floor systems (decks/porches) 36 square feet or less will be included in this permit. To recover lost or misplaced data plates please contact The Institute for Building Technology and Safety there is a fee for this service. Any home moved into or relocated within Onslow County must be certified as a wind zone II as designated on the homes data plate per Appendix J. The permit for a manufactured home will include all inspections required to set up the home, proper utility connections (electrical, mechanical, plumbing, gas) and the installation of the stoops and steps.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |